STEREO Weekly Meeting Minutes for 2006-10-31 (Week 44) ANNOUNCEMENTS ------------- * The optional delta-V maneuver at P1 has been cancelled. INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All instrument central processors have been powered on * All activities on schedule completed * Spacecraft encountered memory scrub anomaly. Software patch will be uploaded before P1. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- * The launch was highly accurate. Successfully completed A1 burn. Have extra fuel margin. * Continuous coverage ends Wednesday evening (Day 306, A: 6:45 UT, B: 7:00 UT). Will have roughly 3 hour tracks. Many contingency tracks have now been cancelled. Many tracks are sequential, with A first and then B. * Current telemetry rate is 96 kbps. * Wednesday, Nov 1, HGA step test added to schedule. Duration is ~2 hours. Sequence of events is 14:40 Behind HGA step test 15:00 Ahead IMPACT boom deployment 17:00 Behind IMPACT boom deployment 17:30 Ahead HGA step test * Spacecraft will roll about Sun line near apogee and perigee to keep HGA side pointed towards Earth * Engineering burn #2 scheduled for Nov 2. FDF will need several days to evaluate. * Starting Nov 1, transitioning to 360 kbps. Will stay at that rate except for maneuvers when the rate will be 96 kbps. * Early Operations Schedule has been modified to use Day-of-Year instead of Mission Day numbers. Available on SDS. * Maneuvers P2 and A3+ are deterministic. * EA mode test on Monday (310) on Ahead spacecraft only. Will take place on outboard track, 3 hours after perigee, about 30 minutes after BOT, around 14:00 UT. - SWAVES, PLASTIC, and SECCHI will allow EA mode to automatically shut them off. IMPACT will power off HV first. - Have 13 hours of track time. Expected to be 6 hour test. Should be able to get SSR data from perigee downloaded during pass. - Decontamination heater bus will be off. Will be restarted by command as part of recovery. Survival heaters come on. - Following EA mode will be functional test of SECCHI Ahead. * Schedule clarification, day 308: PLASTIC does not need exclusive commanding. * SWAVES burst input to IMPACT has been disabled. Awaiting updated SWAVES software. * Weekly schedules will be out soon. * SECCHI functional testing next week, 3 days each for Ahead and Behind. * Day 315, first enabling of GT use, Ahead. * Change request for SECCHI decontamination heaters, early tomorrow morning. Want two hours where turn off macro and leave power on, to evaluate system behavior. Test first Ahead, followed by Behind. Ask if different macros can be implemented for Ahead and Behind--answer was yes. COORDINATED OBSERVATIONS ------------------------ Scheduled activities for Week 44: M Oct 30 (303) A1 Prime Delta V Maneuver T Oct 31 (304) A1 Apogee W Nov 01 (305) Deploy IMPACT boom T Nov 02 (306) 2nd Engineering Burn F Nov 03 (307) S Nov 04 (308) S Nov 05 (309) ------------------------------------------------------------------------------- Scheduled activities for Week 45: M Nov 06 (310) Ahead: EA mode test T Nov 07 (311) W Nov 08 (312) T Nov 09 (313) F Nov 10 (314) Behind: A2 Prime Delta V Maneuver (22:43) S Nov 11 (315) Ahead: A2 Prime Delta V Maneuver (01:38) Ahead: 1st enabling of GT use Behind: A2 Apogee (22:43) S Nov 12 (316) Ahead: A2 Apogee (01:38) Behind: A2 Backup Delta V Maneuver (22:43) ------------------------------------------------------------------------------- Scheduled activities for Week 46: M Nov 13 (317) Ahead: A2 Backup Delta V Maneuver (01:38) Behind: 1st enabling of GT use Power up IMPACT SEP and STE T Nov 14 (318) W Nov 15 (319) T Nov 16 (320) F Nov 17 (321) P2 Perigee & Delta V Maneuver (Ahead 16:34, Behind 12:45) S Nov 18 (322) S Nov 19 (323) ------------------------------------------------------------------------------- Scheduled activities for Week 47: M Nov 20 (324) T Nov 21 (325) W Nov 22 (326) A3 Prime Delta V Maneuver (Ahead 16:39, Behind 14:13) IMPACT MAG rolls, HGA end-to-end slew T Nov 23 (327) A3 Apogee (Ahead 16:39, Behind 14:13) F Nov 24 (328) A3 Backup Delta V Maneuver (Ahead 16:39, Behind 14:13) S Nov 25 (329) S Nov 26 (330)