STEREO Weekly Meeting Minutes for 2007-06-05 (Week 23) INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal, except that the Ahead spacecraft is currently operating on IMU #2. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 22 (last week) * Day 145: Station 26 equipment problem lead to late acquisition and resulting data gaps on Day 143 from 14:58-22:46 UT * Day 150: SECCHI software version 5.03 loaded onto Ahead and Behind. During this time there was a brief (about 3 min) loss of fine pointing. * Day 151: SECCHI synoptic data buffer on Ahead filled leading to a data gap. * Average daily SSR playback during the week was 6.0 gigabits for Ahead and 7.2 gigabits for Behind. Week 23 (this week) * Day 156: Messenger flyby of Venus. This should not affect STEREO operations. * Day 157: (Wednesday) There will be a test of IMU #1 on Ahead. The IMU will be powered up and left in diagnostic mode. It will not be used to operate the spacecraft. * Weekly command load for Ahead will be sent up after the IMU test, on Thursday. * Day 158 The RT battery trickle charge rate on both spacecraft will be adjusted to C/150 * IMPACT team has requested commanding time for Behind this week. Week 24 * No special operations Week 25 * As of June 22 STEREO will have met its minimum success criteria of 150 days collecting science data from heliocentric orbit Week 26 * A test of new autonomy macros is scheduled DSN * Upcoming launches which may affect the DSN schedule DAWN - 20 day launch window opens June 30. Launch contingency schedule should be available by next week. Phoenix launch window Aug. 3-25 Selene scheduled for launch mid-August. For this launch DSN is a backup for Japanese system. Other * PLASTIC team has finished DPU Software testing. They will talk to the MOC in the next couple weeks about sending that up. Load will take about 10 min. The software will be loaded to both spacecraft,perhaps with a gap of a few days between the two. COORDINATED OBSERVATIONS ------------------------ Scheduled activities for Week 23: M Jun 04 (155) T Jun 05 (156) Messenger - Venus fly-by W Jun 06 (157) T Jun 07 (158) F Jun 08 (159) S Jun 09 (160) S Jun 10 (161) ------------------------------------------------------------------------------- Scheduled activities for Week 24: M Jun 11 (162) T Jun 12 (163) W Jun 13 (164) T Jun 14 (165) F Jun 15 (166) S Jun 16 (167) S Jun 17 (168) ------------------------------------------------------------------------------- Scheduled activities for Week 25: M Jun 18 (169) T Jun 19 (170) W Jun 20 (171) T Jun 21 (172) F Jun 22 (173) S Jun 23 (174) S Jun 24 (175) ------------------------------------------------------------------------------- Scheduled activities for Week 26: M Jun 25 (176) T Jun 26 (177) W Jun 27 (178) Test of Macro 145 -- may affect fine pointing T Jun 28 (179) F Jun 29 (180) S Jun 30 (181) S Jul 01 (182) -------------------------------------------------------------------------------